Customizable Project Planner for Remarkable Paper Pro

£10.00

Our Customizable Project Planner is the perfect tool for anyone who needs a dedicated, structured space to plan, track, and deliver projects from start to finish.

Unlike our Classic range — which features pre-defined layouts — our customizable products come with access to our online advanced customization tool. It runs entirely in your browser and requires no software installation to generate your templates.

Scroll down to learn more about everything you can customize!

Payment Options

A planner that matches how you run your projects

Make every section truly your own by choosing from our range of customizable layouts. Select from various task and action item formats, timeline views, note-taking styles, and more. You can also tailor your pages by choosing between lined, squared, dotted, or blank styles. Below you’ll find a preview of the different options available in our advanced Smart Template Creator.

Additional options to match your personal preferences

Customization goes beyond layout. General settings that apply to the planner as a whole include the first day of the week (Sunday or Monday start), toolbar positioning, and language translations. Try them out below.

What’s inside

This planner includes multiple sections, all fully customizable and hyperlinked so you can jump between them with a single tap. Here’s what’s included:

Project Index(1 page)
A master overview of every project in the planner. Log the name, status, and key dates, and jump straight to any project with a single tap.

Action Plan (1 page per project and 1 page per action step)
Break your project down into up to 10 clearly defined action steps, each with its own dedicated page for tasks, owners, deadlines, and progress tracking.

Timeline View (4 pages)
A visual overview of your project schedule. Map out phases, milestones, and dependencies so nothing slips through the cracks.

Project Notes (up to 5 pages per project)
Free-form space for meeting notes, ideas, decisions, and anything else that needs capturing as the project moves forward.

Project Resources (1 page per project)
A single reference page to log the key links, contacts, documents, and tools you need for the project — always one tap away.

Shopping Cart
Scroll to Top